Circuito CHIV102
Distribuidora EdeNorte - Provincia Duarte
Mes-Año | Jul21 | Jun21 | May21 | Abr21 | Mar21 | Feb21 |
---|---|---|---|---|---|---|
Clasificación | A | A | A | A | A | A |
Clientes | 11529 | 11439 | 11410 | 11350 | 11299 | 11227 |
% Nivel Cobranza | 99.50% | 95.05% | 93.74% | 93.05% | 105.90% | 92.61% |
% Nivel Pérdida | 22.09% | 11.80% | 22.70% | 16.45% | 17.06% | 5.33% |
Energía Suministrada (GWh) | 4.88 | 4.35 | 4.54 | 3.93 | 3.75 | 3.35 |
Energía Facturada (GWh) | 3.8 | 3.84 | 3.51 | 3.29 | 3.11 | 3.17 |
Energía Cobrada (GWh) | 3.78 | 3.65 | 3.29 | 3.06 | 3.29 | 2.94 |
% Servicio | 99.26% | 98.33% | 97.34% | 99.35% | 99.12% | 99.42% |
% Sin Servicio | 0.74% | 1.67% | 2.66% | 0.65% | 0.88% | 0.58% |
Interrupción Programada (Hrs) | 5.00 | 5.00 | 5.00 | 0.00 | 3.00 | 0.00 |
Interrupción Ejecutada (Hrs) | 5.42 | 12.18 | 19.44 | 4.75 | 6.46 | 4.24 |
Promedio Interrupción Diarias (Hrs) | 0.18 | 0.40 | 0.64 | 0.16 | 0.21 | 0.14 |
Los Rieles, Urb. Lora, Urb. San Francisco, Urb. Félix Taveras, Genimo, La Enea, Aguas Negras, El Pozo, Urb. Los Maestro.