Circuito CESP103
Distribuidora EdeNorte - Provincia Valverde Mao
Mes-Año | Mar25 | Feb25 | Ene25 | Dic24 | Nov24 | Oct24 |
---|---|---|---|---|---|---|
Clasificación | A | A | A | A | A | A |
Clientes | 9019 | 9019 | 9026 | 9017 | 9002 | 8996 |
% Nivel Cobranza | 0.00% | 94.63% | 91.13% | 115.47% | 97.99% | 99.39% |
% Nivel Pérdida | 0.00% | -1.66% | 3.83% | 9.43% | 1.61% | 6.70% |
Energía Suministrada (GWh) | 0 | 1.8 | 1.97 | 2.11 | 2.13 | 2.58 |
Energía Facturada (GWh) | 0 | 1.83 | 1.9 | 1.91 | 2.09 | 2.41 |
Energía Cobrada (GWh) | 0 | 1.74 | 1.73 | 2.21 | 2.05 | 2.39 |
% Servicio | 98.86% | 99.65% | 99.13% | 99.30% | 99.22% | 97.88% |
% Sin Servicio | 1.14% | 0.35% | 0.87% | 0.70% | 0.78% | 2.12% |
Interrupción Programada (Hrs) | 5.00 | 0.00 | 6.00 | 4.00 | 4.00 | 0.00 |
Interrupción Ejecutada (Hrs) | 8.29 | 2.53 | 6.34 | 5.14 | 5.72 | 15.50 |
Promedio Interrupción Diarias (Hrs) | 0.27 | 0.08 | 0.21 | 0.17 | 0.19 | 0.51 |
Centro de Esperanza parcial (Calle María Trinidad Sánchez, Barrio Norte, Invi SEA, Barrio Sur), Barrio José Clase, Barrio El Cruce, Factoría Peña Alba, Factoría Kelisa, TABADOM, Barrio Nuevo, Cañeo, Barrio El Paraiso, Barrio San Miguel y Barrio El Eden, Callejon de Monguita (Esperanza) Jicome, Hospital José Fco. Peña Gómez