Circuito CABA102A
Distribuidora EdeSur - Provincia Santo Domingo
Mes-Año | Jun25 | May25 | Abr25 | Mar25 | Feb25 | Ene25 |
---|---|---|---|---|---|---|
Clasificación | A | B | A | A | A | A |
Clientes | 17 | 17 | 17 | 19 | 19 | 18 |
% Nivel Cobranza | 0.00% | 97.10% | 72.71% | 113.91% | 106.37% | 106.61% |
% Nivel Pérdida | 0.00% | 32.66% | 27.17% | 46.49% | 33.78% | 38.20% |
Energía Suministrada (GWh) | 0 | 0.39 | 0.46 | 0.45 | 0.42 | 0.47 |
Energía Facturada (GWh) | 0 | 0.26 | 0.33 | 0.24 | 0.28 | 0.29 |
Energía Cobrada (GWh) | 0 | 0.26 | 0.24 | 0.28 | 0.29 | 0.31 |
% Servicio | 99.89% | 99.43% | 99.83% | 99.87% | 99.97% | 99.20% |
% Sin Servicio | 0.11% | 0.57% | 0.17% | 0.13% | 0.03% | 0.80% |
Interrupción Programada (Hrs) | 0.00 | 4.00 | 0.00 | 0.00 | 0.00 | 1.00 |
Interrupción Ejecutada (Hrs) | 0.78 | 4.16 | 1.22 | 0.95 | 0.21 | 5.81 |
Promedio Interrupción Diarias (Hrs) | 0.03 | 0.14 | 0.04 | 0.03 | 0.01 | 0.19 |
Santa Rosa, Campo de pozos de Lechería, Campo de pozos de Hato Nuevo.