Circuito CABA102
Distribuidora EdeSur - Provincia Santo Domingo
Mes-Año | Abr25 | Mar25 | Feb25 | Ene25 | Dic24 | Nov24 |
---|---|---|---|---|---|---|
Clasificación | A | A | A | A | A | A |
Clientes | 20 | 21 | 19 | 19 | 19 | 19 |
% Nivel Cobranza | 95.35% | 101.06% | 97.64% | 115.28% | 102.05% | 109.67% |
% Nivel Pérdida | 30.34% | 25.33% | 20.77% | 37.86% | 8.79% | -72.71% |
Energía Suministrada (GWh) | 1.49 | 1.53 | 1.41 | 1.53 | 1.39 | 0.67 |
Energía Facturada (GWh) | 1.04 | 1.14 | 1.12 | 0.95 | 1.27 | 1.16 |
Energía Cobrada (GWh) | 0.99 | 1.16 | 1.09 | 1.1 | 1.29 | 1.27 |
% Servicio | 99.99% | 99.98% | 99.83% | 99.70% | 99.31% | 99.40% |
% Sin Servicio | 0.01% | 0.02% | 0.17% | 0.30% | 0.69% | 0.60% |
Interrupción Programada (Hrs) | 0.00 | 0.00 | 0.00 | 2.00 | 4.00 | 0.00 |
Interrupción Ejecutada (Hrs) | 0.04 | 0.15 | 1.28 | 2.18 | 5.01 | 4.41 |
Promedio Interrupción Diarias (Hrs) | 0.00 | 0.00 | 0.04 | 0.07 | 0.16 | 0.15 |
Santa Rosa, Campo de pozos de Lechería, Campo de pozos de Hato Nuevo, Tinflex, FRAGASA, Genyux Plastics SRL.