Circuito CABA101
Distribuidora EdeSur - Provincia Santo Domingo
Mes-Año | Mar25 | Feb25 | Ene25 | Dic24 | Nov24 | Oct24 |
---|---|---|---|---|---|---|
Clasificación | D | D | A | A | A | A |
Clientes | 6731 | 6731 | 6712 | 6677 | 6645 | 6617 |
% Nivel Cobranza | 0.00% | 92.63% | 104.99% | 103.11% | 58.61% | 96.48% |
% Nivel Pérdida | 0.00% | 56.01% | 63.40% | 62.28% | 56.01% | 65.27% |
Energía Suministrada (GWh) | 0 | 1.7 | 1.83 | 1.99 | 1.86 | 2.27 |
Energía Facturada (GWh) | 0 | 0.75 | 0.67 | 0.75 | 0.82 | 0.79 |
Energía Cobrada (GWh) | 0 | 0.69 | 0.7 | 0.77 | 0.48 | 0.76 |
% Servicio | 98.54% | 96.22% | 91.94% | 98.81% | 97.94% | 98.61% |
% Sin Servicio | 1.46% | 3.78% | 8.06% | 1.19% | 2.06% | 1.39% |
Interrupción Programada (Hrs) | 0.00 | 18.00 | 40.00 | 4.00 | 0.00 | 0.00 |
Interrupción Ejecutada (Hrs) | 10.65 | 27.61 | 58.85 | 8.67 | 15.01 | 10.13 |
Promedio Interrupción Diarias (Hrs) | 0.35 | 0.91 | 1.93 | 0.28 | 0.49 | 0.33 |
Caballona, Villa Colina, Palave, Batey Lechería, Bo. Nuevo, Bo. Las Colinas, Resid. Nueva Esperanza, Barrio Los Coroneles, Pozos de Lechería, Colinas Ranch.