Circuito BPER104SAP
Distribuidora EdeNorte - Provincia Monseñor Nouel
Mes-Año | Jun25 | May25 | Abr25 | Mar25 | Feb25 | Ene25 |
---|---|---|---|---|---|---|
Clasificación | D | C | C | C | C | C |
Clientes | 4863 | 4863 | 4873 | 4860 | 4844 | 4626 |
% Nivel Cobranza | 0.00% | 98.71% | 89.93% | 141.16% | 72.50% | 76.97% |
% Nivel Pérdida | 0.00% | 56.70% | 50.53% | 54.23% | 36.93% | 50.52% |
Energía Suministrada (GWh) | 0 | 2.96 | 2.66 | 2.82 | 2.05 | 2.55 |
Energía Facturada (GWh) | 0 | 1.28 | 1.32 | 1.29 | 1.3 | 1.26 |
Energía Cobrada (GWh) | 0 | 1.27 | 1.18 | 1.82 | 0.94 | 0.97 |
% Servicio | 96.38% | 97.73% | 97.94% | 98.34% | 98.69% | 94.44% |
% Sin Servicio | 3.62% | 2.27% | 2.06% | 1.66% | 1.31% | 5.56% |
Interrupción Programada (Hrs) | 21.00 | 2.00 | 0.00 | 0.00 | 0.00 | 25.00 |
Interrupción Ejecutada (Hrs) | 26.42 | 16.60 | 15.04 | 12.10 | 9.53 | 40.56 |
Promedio Interrupción Diarias (Hrs) | 0.87 | 0.55 | 0.49 | 0.40 | 0.31 | 1.33 |
Sabana del Puerto, Jayaco, La Recta, El Abanico, Callejon El Puerton, San Isidro, Caño Piedra, Jima de Bonao, Callejon de Mallia, Callejon La Copla, Carretera Peñalo y Fula.