| Mes-Año | Jun25 | May25 | Abr25 | Mar25 | Feb25 | Ene25 |
|---|---|---|---|---|---|---|
| Clasificación | C | C | C | C | C | C |
| Clientes | 783 | 783 | 786 | 766 | 775 | 775 |
| % Nivel Cobranza | 0.00% | 113.88% | 81.45% | 75.87% | 69.30% | 88.87% |
| % Nivel Pérdida | 0.00% | 72.01% | 57.81% | 57.70% | 52.63% | 56.34% |
| Energía Suministrada (GWh) | 0 | 0.78 | 0.72 | 0.74 | 0.60 | 0.64 |
| Energía Facturada (GWh) | 0 | 0.22 | 0.30 | 0.31 | 0.28 | 0.28 |
| Energía Cobrada (GWh) | 0 | 0.25 | 0.25 | 0.24 | 0.20 | 0.25 |
| % Servicio | 91.89% | 99.37% | 98.68% | 99.46% | 97.57% | 92.13% |
| % Sin Servicio | 8.11% | 0.63% | 1.32% | 0.54% | 2.43% | 7.87% |
| Interrupción Programada (Hrs) | 35.00 | 0.00 | 5.00 | 0.00 | 15.00 | 48.00 |
| Interrupción Ejecutada (Hrs) | 59.23 | 4.57 | 9.62 | 3.93 | 17.77 | 57.43 |
| Promedio Interrupción Diarias (Hrs) | 1.95 | 0.15 | 0.32 | 0.13 | 0.58 | 1.89 |