Circuito BANP104A
Distribuidora EdeSur - Provincia Peravia
Mes-Año | Dic23 | Nov23 | Oct23 | Sep23 | Ago23 | Jul23 |
---|---|---|---|---|---|---|
Clasificación | A | A | A | A | A | A |
Clientes | 556 | 556 | 556 | 556 | 556 | 556 |
% Nivel Cobranza | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
% Nivel Pérdida | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
Energía Suministrada (GWh) | 0 | 0 | 0 | 0 | 0 | 0 |
Energía Facturada (GWh) | 0 | 0 | 0 | 0 | 0 | 0 |
Energía Cobrada (GWh) | 0 | 0 | 0 | 0 | 0 | 0 |
% Servicio | 98.27% | 98.62% | 98.89% | 97.83% | 98.71% | 99.37% |
% Sin Servicio | 1.73% | 1.38% | 1.11% | 2.17% | 1.29% | 0.63% |
Interrupción Programada (Hrs) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Interrupción Ejecutada (Hrs) | 12.60 | 10.05 | 8.10 | 15.81 | 9.40 | 4.57 |
Promedio Interrupción Diarias (Hrs) | 0.41 | 0.33 | 0.27 | 0.52 | 0.31 | 0.15 |
El Llano, Boca Canasta,