Circuito BANP103
Distribuidora EdeSur - Provincia Peravia
Mes-Año | Abr25 | Mar25 | Feb25 | Ene25 | Dic24 | Nov24 |
---|---|---|---|---|---|---|
Clasificación | D | D | D | D | A | D |
Clientes | 5778 | 5776 | 5783 | 5804 | 5828 | 5849 |
% Nivel Cobranza | 87.96% | 94.61% | 100.36% | 90.57% | 98.97% | 105.84% |
% Nivel Pérdida | 59.43% | 60.73% | 56.87% | 56.41% | 59.37% | 53.13% |
Energía Suministrada (GWh) | 3.39 | 3.33 | 2.81 | 3.02 | 3.13 | 2.96 |
Energía Facturada (GWh) | 1.37 | 1.31 | 1.21 | 1.32 | 1.27 | 1.39 |
Energía Cobrada (GWh) | 1.21 | 1.24 | 1.21 | 1.19 | 1.26 | 1.47 |
% Servicio | 95.96% | 96.63% | 94.72% | 90.26% | 97.46% | 96.53% |
% Sin Servicio | 4.04% | 3.37% | 5.28% | 9.74% | 2.54% | 3.47% |
Interrupción Programada (Hrs) | 12.00 | 12.00 | 25.00 | 44.00 | 11.00 | 12.00 |
Interrupción Ejecutada (Hrs) | 29.49 | 24.58 | 38.52 | 71.07 | 18.54 | 25.32 |
Promedio Interrupción Diarias (Hrs) | 0.97 | 0.81 | 1.27 | 2.34 | 0.61 | 0.83 |
Cañafistol, Galeón, Los Barracones, Calabasa, Angostura, El Tablazo, Matanzas, Sombrero, Los Jobos.