Circuito BANP103
Distribuidora EdeSur - Provincia Peravia
| Mes-Año | Jun25 | May25 | Abr25 | Mar25 | Feb25 | Ene25 |
|---|---|---|---|---|---|---|
| Clasificación | A | D | D | D | D | D |
| Clientes | 5780 | 5780 | 5778 | 5776 | 5783 | 5804 |
| % Nivel Cobranza | 0.00% | 92.73% | 87.96% | 94.61% | 100.36% | 90.57% |
| % Nivel Pérdida | 0.00% | 59.54% | 59.43% | 60.73% | 56.87% | 56.41% |
| Energía Suministrada (GWh) | 0 | 3.67 | 3.39 | 3.33 | 2.81 | 3.02 |
| Energía Facturada (GWh) | 0 | 1.48 | 1.37 | 1.31 | 1.21 | 1.32 |
| Energía Cobrada (GWh) | 0 | 1.38 | 1.21 | 1.24 | 1.21 | 1.19 |
| % Servicio | 96.63% | 95.17% | 95.96% | 96.63% | 94.72% | 90.26% |
| % Sin Servicio | 3.37% | 4.83% | 4.04% | 3.37% | 5.28% | 9.74% |
| Interrupción Programada (Hrs) | 16.00 | 17.00 | 12.00 | 12.00 | 25.00 | 44.00 |
| Interrupción Ejecutada (Hrs) | 24.57 | 35.27 | 29.49 | 24.58 | 38.52 | 71.07 |
| Promedio Interrupción Diarias (Hrs) | 0.81 | 1.16 | 0.97 | 0.81 | 1.27 | 2.34 |
Cañafistol, Galeón, Los Barracones, Calabasa, Angostura, El Tablazo, Matanzas, Sombrero, Los Jobos.