Circuito AZUA102A
Distribuidora EdeSur - Provincia Azua
Mes-Año | May23 | Abr23 | Mar23 | Feb23 | Ene23 | Dic22 |
---|---|---|---|---|---|---|
Clasificación | D | A | A | A | A | A |
Clientes | 0 | 655 | 655 | 655 | 655 | 663 |
% Nivel Cobranza | 90.52% | 81.31% | 97.17% | 103.70% | 84.14% | 87.61% |
% Nivel Pérdida | 52.83% | 80.11% | 75.10% | 71.37% | 73.42% | 75.98% |
Energía Suministrada (GWh) | 0.18 | 0.44 | 0.35 | 0.29 | 0.35 | 0.41 |
Energía Facturada (GWh) | 0.09 | 0.09 | 0.09 | 0.08 | 0.09 | 0.1 |
Energía Cobrada (GWh) | 0.08 | 0.07 | 0.08 | 0.09 | 0.08 | 0.09 |
% Servicio | 0.00% | 99.97% | 100.00% | 100.00% | 98.89% | 99.76% |
% Sin Servicio | 0.00% | 0.03% | 0.00% | 0.00% | 1.11% | 0.24% |
Interrupción Programada (Hrs) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Interrupción Ejecutada (Hrs) | 0.00 | 0.21 | 0.00 | 0.00 | 8.12 | 1.76 |
Promedio Interrupción Diarias (Hrs) | 0.00 | 0.01 | 0.00 | 0.00 | 0.27 | 0.06 |
El Prado, La Colonia Española (parcial).