Circuito AZUA101A
Distribuidora EdeSur - Provincia Azua
Mes-Año | Jun25 | May25 | Abr25 | Mar25 | Feb25 | Ene25 |
---|---|---|---|---|---|---|
Clasificación | A | C | C | C | C | D |
Clientes | 1834 | 1834 | 1837 | 1838 | 1844 | 1833 |
% Nivel Cobranza | 0.00% | 60.02% | 54.89% | 58.20% | 53.78% | 60.98% |
% Nivel Pérdida | 0.00% | 71.67% | 70.50% | 72.93% | 67.29% | 68.81% |
Energía Suministrada (GWh) | 0 | 1.15 | 1.1 | 1.08 | 0.93 | 1.01 |
Energía Facturada (GWh) | 0 | 0.33 | 0.32 | 0.29 | 0.3 | 0.32 |
Energía Cobrada (GWh) | 0 | 0.2 | 0.18 | 0.17 | 0.16 | 0.19 |
% Servicio | 97.69% | 99.11% | 99.80% | 99.43% | 99.70% | 98.39% |
% Sin Servicio | 2.31% | 0.89% | 0.20% | 0.57% | 0.30% | 1.61% |
Interrupción Programada (Hrs) | 10.00 | 6.00 | 8.00 | 0.00 | 0.00 | 1.00 |
Interrupción Ejecutada (Hrs) | 16.83 | 6.52 | 1.46 | 4.16 | 2.22 | 11.78 |
Promedio Interrupción Diarias (Hrs) | 0.55 | 0.21 | 0.05 | 0.14 | 0.07 | 0.39 |
El Barro, Bo. El Higuero, Bo. Camboya, Bo. Los Jobos, Las Lomas, Peralta, Majagual.