Circuito AZUA101
Distribuidora EdeSur - Provincia Azua
Mes-Año | Mar25 | Feb25 | Ene25 | Dic24 | Nov24 | Oct24 |
---|---|---|---|---|---|---|
Clasificación | C | C | A | A | A | A |
Clientes | 7419 | 7419 | 7439 | 7424 | 7457 | 7532 |
% Nivel Cobranza | 0.00% | 89.79% | 100.92% | 91.51% | 94.66% | 96.45% |
% Nivel Pérdida | 0.00% | 40.67% | 36.67% | 44.84% | 35.90% | 45.25% |
Energía Suministrada (GWh) | 0 | 3.9 | 4.11 | 4.54 | 4.19 | 5.24 |
Energía Facturada (GWh) | 0 | 2.32 | 2.6 | 2.51 | 2.69 | 2.87 |
Energía Cobrada (GWh) | 0 | 2.08 | 2.63 | 2.29 | 2.54 | 2.77 |
% Servicio | 96.82% | 95.20% | 92.47% | 98.89% | 99.16% | 97.98% |
% Sin Servicio | 3.18% | 4.80% | 7.53% | 1.11% | 0.84% | 2.02% |
Interrupción Programada (Hrs) | 8.00 | 22.00 | 39.00 | 3.00 | 0.00 | 0.00 |
Interrupción Ejecutada (Hrs) | 23.21 | 35.04 | 54.95 | 8.12 | 6.11 | 14.75 |
Promedio Interrupción Diarias (Hrs) | 0.76 | 1.15 | 1.81 | 0.27 | 0.20 | 0.48 |
Centro del Pueblo de Azua, Bo. Simón Striddels, Bo. La Cuchilla, Bo. La Placeta, Bo. El Hoyo, Peralta, Camboya, Bo. La Bombita, Bo. Los Parceleros, Bo. Juan Pablo Duarte, El Barro, Peralta: Bo. El Higuero, Los Jobos, Barrio Resoly, Las Yayitas, sistemas de bombea de INAPA Azua.