Circuito ATPISA
Distribuidora EdeSur - Provincia San Cristóbal
Mes-Año | Jun25 | May25 | Abr25 | Mar25 | Feb25 | Ene25 |
---|---|---|---|---|---|---|
Clasificación | A | A | A | A | A | A |
Clientes | 1 | 1 | 1 | 1 | 1 | 1 |
% Nivel Cobranza | 0.00% | 100.00% | 177.93% | 100.01% | 0.00% | 100.00% |
% Nivel Pérdida | 0.00% | 5.22% | -28.26% | 22.07% | -0.01% | 38.00% |
Energía Suministrada (GWh) | 0 | 1.07 | 1.01 | 1.3 | 1.01 | 1.01 |
Energía Facturada (GWh) | 0 | 1.01 | 1.3 | 1.01 | 1.01 | 0.63 |
Energía Cobrada (GWh) | 0 | 1.01 | 2.31 | 1.01 | 0 | 0.63 |
% Servicio | 100.00% | 100.00% | 100.00% | 100.00% | 100.00% | 99.97% |
% Sin Servicio | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.03% |
Interrupción Programada (Hrs) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Interrupción Ejecutada (Hrs) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.19 |
Promedio Interrupción Diarias (Hrs) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.01 |