Circuito ATCASD
Distribuidora EdeSur - Provincia Santo Domingo
Mes-Año | Jun25 | May25 | Abr25 | Mar25 | Feb25 | Ene25 |
---|---|---|---|---|---|---|
Clasificación | A | A | A | A | A | A |
Clientes | 1 | 1 | 1 | 1 | 1 | 1 |
% Nivel Cobranza | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
% Nivel Pérdida | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
Energía Suministrada (GWh) | 0 | 0 | 0 | 0 | 0 | 0 |
Energía Facturada (GWh) | 0 | 0 | 0 | 0 | 0 | 0 |
Energía Cobrada (GWh) | 0 | 0 | 0 | 0 | 0 | 0 |
% Servicio | 99.50% | 99.50% | 99.58% | 99.79% | 99.87% | 100.00% |
% Sin Servicio | 0.50% | 0.50% | 0.42% | 0.21% | 0.13% | 0.00% |
Interrupción Programada (Hrs) | 0.00 | 3.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Interrupción Ejecutada (Hrs) | 3.65 | 3.67 | 3.10 | 1.53 | 0.98 | 0.00 |
Promedio Interrupción Diarias (Hrs) | 0.12 | 0.12 | 0.10 | 0.05 | 0.03 | 0.00 |
Bomba de la CAASD.