Circuito ATCAAS
Distribuidora EdeSur - Provincia Santo Domingo
| Mes-Año | Jun25 | May25 | Abr25 | Mar25 | Feb25 | Ene25 |
|---|---|---|---|---|---|---|
| Clasificación | A | A | A | A | A | A |
| Clientes | 1 | 1 | 1 | 1 | 1 | 1 |
| % Nivel Cobranza | 0.00% | 121.41% | 86.09% | 119.74% | 91.15% | 92.51% |
| % Nivel Pérdida | 0.00% | -2.11% | -21.41% | 13.91% | -19.74% | 8.85% |
| Energía Suministrada (GWh) | 0 | 0.56 | 0.58 | 0.7 | 0.6 | 0.72 |
| Energía Facturada (GWh) | 0 | 0.58 | 0.7 | 0.6 | 0.72 | 0.66 |
| Energía Cobrada (GWh) | 0 | 0.7 | 0.6 | 0.72 | 0.66 | 0.61 |
| % Servicio | 99.71% | 99.50% | 100.00% | 99.98% | 99.87% | 100.00% |
| % Sin Servicio | 0.29% | 0.50% | 0.00% | 0.02% | 0.13% | 0.00% |
| Interrupción Programada (Hrs) | 0.00 | 3.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Interrupción Ejecutada (Hrs) | 2.10 | 3.67 | 0.00 | 0.12 | 0.98 | 0.00 |
| Promedio Interrupción Diarias (Hrs) | 0.07 | 0.12 | 0.00 | 0.00 | 0.03 | 0.00 |
Campos de Pozos de la CAASD.