Circuito ATC16A
Distribuidora EdeSur - Provincia Santo Domingo
Mes-Año | Abr25 | Mar25 | Feb25 | Ene25 | Dic24 | Nov24 |
---|---|---|---|---|---|---|
Clasificación | A | A | A | A | A | A |
Clientes | 1 | 1 | 1 | 1 | 1 | 1 |
% Nivel Cobranza | 79.53% | 110.31% | 104.84% | 96.02% | 127.09% | 98.33% |
% Nivel Pérdida | -5.80% | 20.47% | -10.31% | -4.84% | 3.98% | -27.09% |
Energía Suministrada (GWh) | 0.39 | 0.41 | 0.33 | 0.36 | 0.38 | 0.37 |
Energía Facturada (GWh) | 0.41 | 0.33 | 0.36 | 0.38 | 0.37 | 0.46 |
Energía Cobrada (GWh) | 0.33 | 0.36 | 0.38 | 0.37 | 0.46 | 0.46 |
% Servicio | 98.93% | 99.11% | 100.00% | 99.88% | 99.76% | 99.35% |
% Sin Servicio | 1.07% | 0.89% | 0.00% | 0.12% | 0.24% | 0.65% |
Interrupción Programada (Hrs) | 0.00 | 4.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Interrupción Ejecutada (Hrs) | 7.84 | 6.50 | 0.00 | 0.85 | 1.75 | 4.72 |
Promedio Interrupción Diarias (Hrs) | 0.26 | 0.21 | 0.00 | 0.03 | 0.06 | 0.16 |
Campamento 16 de Agosto.