Circuito AHON102A
Distribuidora EdeSur - Provincia Distrito Nacional
Mes-Año | Mar25 | Feb25 | Ene25 | Dic24 | Nov24 | Oct24 |
---|---|---|---|---|---|---|
Clasificación | B | B | A | A | A | A |
Clientes | 533 | 533 | 530 | 528 | 527 | 525 |
% Nivel Cobranza | 0.00% | 96.09% | 107.95% | 104.02% | 118.04% | 97.29% |
% Nivel Pérdida | 0.00% | 70.03% | 76.32% | 76.57% | 74.79% | 67.76% |
Energía Suministrada (GWh) | 0 | 0.6 | 0.73 | 0.77 | 0.74 | 0.72 |
Energía Facturada (GWh) | 0 | 0.18 | 0.17 | 0.18 | 0.19 | 0.23 |
Energía Cobrada (GWh) | 0 | 0.17 | 0.19 | 0.19 | 0.22 | 0.23 |
% Servicio | 99.18% | 98.52% | 99.92% | 99.75% | 99.75% | 99.85% |
% Sin Servicio | 0.82% | 1.48% | 0.08% | 0.25% | 0.25% | 0.15% |
Interrupción Programada (Hrs) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Interrupción Ejecutada (Hrs) | 6.00 | 10.79 | 0.60 | 1.84 | 1.81 | 1.10 |
Promedio Interrupción Diarias (Hrs) | 0.20 | 0.35 | 0.02 | 0.06 | 0.06 | 0.04 |
La Puya de Arroyo Hondo