Circuito AHON102A
Distribuidora EdeSur - Provincia Distrito Nacional
| Mes-Año | Jun25 | May25 | Abr25 | Mar25 | Feb25 | Ene25 |
|---|---|---|---|---|---|---|
| Clasificación | A | B | B | B | B | A |
| Clientes | 544 | 544 | 543 | 539 | 533 | 530 |
| % Nivel Cobranza | 0.00% | 97.35% | 91.31% | 91.51% | 96.09% | 107.95% |
| % Nivel Pérdida | 0.00% | 78.06% | 74.53% | 76.49% | 70.03% | 76.32% |
| Energía Suministrada (GWh) | 0 | 0.9 | 0.78 | 0.81 | 0.6 | 0.73 |
| Energía Facturada (GWh) | 0 | 0.2 | 0.2 | 0.19 | 0.18 | 0.17 |
| Energía Cobrada (GWh) | 0 | 0.19 | 0.18 | 0.17 | 0.17 | 0.19 |
| % Servicio | 99.17% | 99.17% | 99.27% | 99.18% | 98.52% | 99.92% |
| % Sin Servicio | 0.83% | 0.83% | 0.73% | 0.82% | 1.48% | 0.08% |
| Interrupción Programada (Hrs) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Interrupción Ejecutada (Hrs) | 6.06 | 6.06 | 5.31 | 6.00 | 10.79 | 0.60 |
| Promedio Interrupción Diarias (Hrs) | 0.20 | 0.20 | 0.17 | 0.20 | 0.35 | 0.02 |
La Puya de Arroyo Hondo